        Controlled thermonuclear fusion is on the European Strategic Energy 
Technology Plan roadmap  (also known as SET Plan) as a technology which
offers the prospect of an intrinsically safe,  virtually inexhaustible 
energy source. From a global perspective, there is a need for massive
base  load electricity production. Can fusion be developed to become
economically competitive? When  will fusion be contributing to electricity
production? The next step in the development of a fusion  reactor is
the ITER experiment under construction at Cadarache France. ITER is
an international  collaboration between the EU, Japan, USA, Russian
Federation, China, South Korea and India. The  International ITER
Agreement was signed in October 2006. The mission is as follows:
 Start operation 2018.
  Demonstrate capability of steady state fusion power production.
  Optimise burning plasma confinement under reactor conditions.
  Have dimensions comparable to a power station and produce about 
     500 MW of fusion power (10x more power than needed to run it).
  Demonstrate or develop new technologies and materials required for 
     fusion power stations.
The initial phase of the project has included a design review and an update of the scope, schedule and cost which takes consideration of new developments and recent progress in fusion research. Procurement is underway for long leadtime components.