Speaker
            Mr
    Eric Heine
        
            (Nikhef)
        
    Description
With the first phase of the implementation of the KM3NeT Research Infrastructure in 
the Mediterranean Sea, several design and technical choices have been made for the 
realization of the power network at the installation sites. Considerations for these 
choices - which are valid for large area detector networks in general - include the 
arguments for AC or DC, the behaviour of the power network at constant power 
load, the implementation of several voltage level conversions and grounding issues. 
We will present the design and implementation choices of the power networks 
currently realized for the large area KM3NeT-Fr and KM3NeT-It installation sites.
            Author
        
            
                
                        Mr
                    
                
                    Eric Heine
                
                
                        (Nikhef)